The LTP of the company as of now is at 843.00 after the 16.00 points loss today.
The LTP of the company as of now is at 534.50 after the 17.30 points loss today.
NEPSE concludes at 2,081.31 points today.
The hydropower company is currently constructing a 26-megawatt hydropower project in Khudi.
The 30th annual general meeting of HEI is scheduled for Thursday, the 25th of Magh.
Despite economic challenges, the insurance sector, especially life insurance, has shown resilience and growth.
The application period for the IPO of Sarbottam Cement has ended today.
Annual General Meeting (AGM) set for 1st Falgun, 2080.
A total of 80 companies made positive changes while 153 companies declined on their rate. 14 companies were unchanged.
The production was interrupted due floods in the eastern part of Nepal.
.. ..
सामाजिक संजाल
Artha Kendra
सूचना विभाग दर्ता नं. : ४१९७-२०८०/२०८१
प्रधान सम्पादक : दिपेश खनाल
मार्केटिङ : +९७७ ९८४७८५४३२८
2024 arthakendra.com All Rights Reserved.